Soprawalk is heat welded to approved substrates or applied with approved cold adhesive or hot asphalt following manufacturer specifications.
Soprema sbs roofing manual.
Sopra iso plus colgrip a mineral fibre rock wool insulation boards 3 3 1.
Place soprafix base 611 in desired position.
15 2019 industry advancement.
Refer to the soprema sbs roofing manual for additional application guidelines.
Sopralene 250 sp 4 0 is an sbs modified bitumen base ply for use in approved multi ply membrane and flashing assemblies.
Soprema continues investment in next generation with scholarship program 11 19 2019 media multiple 5 000 awards to support students studying architecture engineering other building envelope fields wadsworth ohio nov.
Elastophene fr gr is then rolled into the cold adhesive or hot asphalt and subsequently rolled with a weighted roller.
Apply approved cold adhesive or hot asphalt following manufacturer specifications.
The main components of the roofing and waterproofing systems are the traditional sopralene and elastophene membranes and the high performance composite systems all tough flexible sbs polymer modified bitumen prefabricated sheets appropriately reinforced and surface finished for specific application.
Roofing materials recovery insulation boards and accessories installation of recovery insulation boards mechanically fastened or adhered with adhesive polyisocyanurate insulation board sopra iso 3 2 1.
Subsequent approved inter ply or cap ply membranes are applied to soprafix base 611 via heat welding.
Sopralene 250 sp 4 0 is composed of a proprietary formulation of elastomeric styrene butadiene styrene sbs polymer modified bitumen and is reinforced with a tough dimensionally stable non woven polyester mat.
Place elastophene fr gr in desired position and back roll the product.
Elastophene flam ls fr gr is then heat welded to approved substrates.
Refer to the soprema sbs roofing manual for additional application guidelines.
Soprema vice president and general manager tim kersey will speak with rooferscoffeeshop partner heidi j.
Position elastophene flam ls fr gr in desired position and back roll the product.
O soprema 3 repair and re cover roofing guide table of contents 1 0 evaluation of the condition of the roofing system 4 1 1 visual inspection 4 1 2 thermographic or hygrometric analysis 5 1 3 types of defects 5 2 0 reconstruction of sbs modified bitumen membranes 6 2 1 granule loss 6 2 1 1 membrane regranulation with liquid coatings and bulk granules 6.
Soprawalk is then rolled into the cold adhesive or hot asphalt and subsequently rolled with a weighted roller.
Prior to installation unroll elastophene flam ls fr gr onto the roof surface and allow to relax.
Ellsworth in a special webinar living roof protects veterans stories the museum and memorial is truly an architectural work of art that honors and remembers all veterans.
Refer to the soprema sbs roofing manual for additional application guidelines.